{"id":25856,"date":"2016-12-16T09:10:39","date_gmt":"2016-12-16T08:10:39","guid":{"rendered":"https:\/\/www.ctelift.com\/fr\/2016\/12\/16\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/"},"modified":"2016-12-19T14:52:45","modified_gmt":"2016-12-19T13:52:45","slug":"la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia","status":"publish","type":"post","link":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/","title":{"rendered":"The first CTE ZED 20.2 HVS delivering to Sicily"},"content":{"rendered":"<p><strong>S3 Smart Stability System is now available also on the CTE best seller 20 m of working height.\u00a0<\/strong><\/p>\n<p>The innovative <strong>S3 Smart Stability System<\/strong>, showed as world premiere at the last Bauma 2016 on CTE ZED 21.1 JHV, is now available also on the truck-mounted articulated platform <strong>CTE ZED 20.2 HVS<\/strong>, and the firs unit is delivering to Sicily.<\/p>\n<p><strong>FOCUS ON PRODUCT: CTE ZED 20.2 HVS<\/strong> is a truck-mounted articulated platform that reaches 20 m of working height, 8.7 m of outreach and 300 kg of basket capacity. It has the innovative S3 Smart Stability System with H frame stabilizers. A system that adapts in real time to the conditions of use, basket load and geometry, automatically, and allows the user of to taking advantage of the full potential of each type of platform, irrespective of the vehicle characteristics on which it is mounted or the geometry of its superstructure. Thanks to S3, the operator can easily set the machine in various stabiliser configurations: fixed narrow jacking rear outriggers and variable jacking front outriggers (extended, in shape, or extended to left\/right) to enable many different work applications.<\/p>\n<p><strong>CTE ZED 20.2 HVS<\/strong> has 2 specific innovations:<br \/>\n\u2022 The innovative <strong>HOME<\/strong> function feature: it allows, through the specific \u00ab\u00a0HOME\u00a0\u00bb button, to safely close the platform from every position of the boom. When the platform is closed, the same button allows to open the platform in the most suitable and safe way to let then start the desired maneuvers;<br \/>\n\u2022 the <strong>AUTOMATIC STABILISING SYSTEM FROM THE BASKET<\/strong>: the operator could stabilise and level the platform directly from the basket, and also for the closing maneuvers.<\/p>\n<p>This model presents also the revolution applied to the electrical and hydraulic systems with the introduction of a <strong>CAN BUS<\/strong> management system and a new hydraulic management system; it has also engine variable speed depending on the used maneuvers, smooth maneuvers with acceleration and deceleration ramps, and a ground control station with 7m cable wired console. To simplify the management of the service, it has been studied a diagnostic tool in common with other <strong>CTE<\/strong> platforms (<strong>ZED, TRACCESS, B-LIFT<\/strong>). This model is really compact in transport and working position, to easily work in narrow spaces or in city centers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>S3 Smart Stability System is now available also on the CTE best seller 20 m of working height.\u00a0 The innovative S3 Smart Stability System, showed as world premiere at the last Bauma 2016 on CTE ZED 21.1 JHV, is now available also on the truck-mounted articulated platform CTE ZED 20.2 HVS, and the firs unit [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":25817,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[277],"tags":[],"class_list":["post-25856","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-fr"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The first CTE ZED 20.2 HVS delivering to Sicily - CTE<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The first CTE ZED 20.2 HVS delivering to Sicily - CTE\" \/>\n<meta property=\"og:description\" content=\"S3 Smart Stability System is now available also on the CTE best seller 20 m of working height.\u00a0 The innovative S3 Smart Stability System, showed as world premiere at the last Bauma 2016 on CTE ZED 21.1 JHV, is now available also on the truck-mounted articulated platform CTE ZED 20.2 HVS, and the firs unit [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/\" \/>\n<meta property=\"og:site_name\" content=\"CTE\" \/>\n<meta property=\"article:published_time\" content=\"2016-12-16T08:10:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-12-19T13:52:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cteuser\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"cteuser\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/\"},\"author\":{\"name\":\"cteuser\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/#\\\/schema\\\/person\\\/b83f56a5bd85503f355fa1544c350ab9\"},\"headline\":\"The first CTE ZED 20.2 HVS delivering to Sicily\",\"datePublished\":\"2016-12-16T08:10:39+00:00\",\"dateModified\":\"2016-12-19T13:52:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/\"},\"wordCount\":368,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/staging.ctelift.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/\",\"url\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/\",\"name\":\"The first CTE ZED 20.2 HVS delivering to Sicily - CTE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/staging.ctelift.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg\",\"datePublished\":\"2016-12-16T08:10:39+00:00\",\"dateModified\":\"2016-12-19T13:52:45+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/#\\\/schema\\\/person\\\/b83f56a5bd85503f355fa1544c350ab9\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/staging.ctelift.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg\",\"contentUrl\":\"https:\\\/\\\/staging.ctelift.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The first CTE ZED 20.2 HVS delivering to Sicily\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/#website\",\"url\":\"https:\\\/\\\/staging.ctelift.com\\\/\",\"name\":\"CTE\",\"description\":\"work becomes easy\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/staging.ctelift.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/staging.ctelift.com\\\/#\\\/schema\\\/person\\\/b83f56a5bd85503f355fa1544c350ab9\",\"name\":\"cteuser\",\"url\":\"https:\\\/\\\/staging.ctelift.com\\\/fr\\\/author\\\/cteuser\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The first CTE ZED 20.2 HVS delivering to Sicily - CTE","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"fr_FR","og_type":"article","og_title":"The first CTE ZED 20.2 HVS delivering to Sicily - CTE","og_description":"S3 Smart Stability System is now available also on the CTE best seller 20 m of working height.\u00a0 The innovative S3 Smart Stability System, showed as world premiere at the last Bauma 2016 on CTE ZED 21.1 JHV, is now available also on the truck-mounted articulated platform CTE ZED 20.2 HVS, and the firs unit [&hellip;]","og_url":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/","og_site_name":"CTE","article_published_time":"2016-12-16T08:10:39+00:00","article_modified_time":"2016-12-19T13:52:45+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg","type":"image\/jpeg"}],"author":"cteuser","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"cteuser","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#article","isPartOf":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/"},"author":{"name":"cteuser","@id":"https:\/\/staging.ctelift.com\/#\/schema\/person\/b83f56a5bd85503f355fa1544c350ab9"},"headline":"The first CTE ZED 20.2 HVS delivering to Sicily","datePublished":"2016-12-16T08:10:39+00:00","dateModified":"2016-12-19T13:52:45+00:00","mainEntityOfPage":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/"},"wordCount":368,"commentCount":0,"image":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg","articleSection":["News"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/","url":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/","name":"The first CTE ZED 20.2 HVS delivering to Sicily - CTE","isPartOf":{"@id":"https:\/\/staging.ctelift.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#primaryimage"},"image":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg","datePublished":"2016-12-16T08:10:39+00:00","dateModified":"2016-12-19T13:52:45+00:00","author":{"@id":"https:\/\/staging.ctelift.com\/#\/schema\/person\/b83f56a5bd85503f355fa1544c350ab9"},"breadcrumb":{"@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#primaryimage","url":"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg","contentUrl":"https:\/\/staging.ctelift.com\/wp-content\/uploads\/2016\/12\/CTE-ZED-20.2-HVS-300-kg-capacity.jpg","width":2000,"height":1333},{"@type":"BreadcrumbList","@id":"https:\/\/staging.ctelift.com\/fr\/la-prima-cte-zed-20-2-hvs-parte-per-la-sicilia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/staging.ctelift.com\/fr\/"},{"@type":"ListItem","position":2,"name":"The first CTE ZED 20.2 HVS delivering to Sicily"}]},{"@type":"WebSite","@id":"https:\/\/staging.ctelift.com\/#website","url":"https:\/\/staging.ctelift.com\/","name":"CTE","description":"work becomes easy","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/staging.ctelift.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/staging.ctelift.com\/#\/schema\/person\/b83f56a5bd85503f355fa1544c350ab9","name":"cteuser","url":"https:\/\/staging.ctelift.com\/fr\/author\/cteuser\/"}]}},"_links":{"self":[{"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/posts\/25856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/comments?post=25856"}],"version-history":[{"count":3,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/posts\/25856\/revisions"}],"predecessor-version":[{"id":25880,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/posts\/25856\/revisions\/25880"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/media\/25817"}],"wp:attachment":[{"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/media?parent=25856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/categories?post=25856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging.ctelift.com\/fr\/wp-json\/wp\/v2\/tags?post=25856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}